Arbitrary construction settlements

&

Change of Use of Property

Τακτοποιήσεις-αυθαιρέτων-και-αλλαγή-χρήσης_Dimisign

At Dimisign we undertake the settlement of unauthorized constructions and change of use of property, with responsible technical control and full support in accordance with the applicable legislation.

Νομοθεσία 4495/17 με την οποία πραγματοποιεί τις υπαγωγές για τακτοποιήσεις η Dimisign

The regularisation of arbitrary constructions and the change of use of a property are necessary procedures for the legal development, transfer or renovation of a property. Proper technical assessment and compliance with the prescribed provisions ensure compliance with the law and prevent future problems.

At Dimisignwe undertake the complete procedure for the inclusion of the property that has unauthorized constructions, from the inspection of the property and the determination of the existing situation to the preparation and submission of the file. Each case is considered individually, based on the actual facts and the requirements of the legislation. [Ν.4495/2017(ισχύουσα νομοθεσία)].

At the same time, full support is provided for change of use of real estate, such as conversion into a residence, shop or business premises, in order to ensure the legal and safe use of the space according to its intended purpose.

What is the settlement of arbitrary constructions

The regularization of unauthorized constructions concerns the declaration and inclusion of constructions or alterations that have been carried out without the required permit, in accordance with the applicable legal provisions.

When settlement is required

Regularisation is required in cases of unauthorised extensions, changes in layout, changes of use or constructions that are not reflected in the approved plans.

What is a change of use of property

A change of use refers to a change in the way a space is used, such as the conversion of a shop into a residence or office, and requires a technical study and approval by the competent authorities.

Process & technical control

The process includes autopsy, survey, legality check, drawing up plans and submission of the necessary data, with continuous technical support at every stage.

For more information or to start the affiliation process contact me via the form:

Full name
What service would you like to discuss?;
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 15 files.

Issuance of Building Permits

Fully undertake the issuing of building permits for new construction, additions and alterations to existing buildings.
Learn More

Small-scale licences

Issuing small-scale permits for renovations and technical works, quickly and responsibly.
Learn More

Arbitrary constructions & Change of use of property

Submission of arbitrary constructions and change of use of real estate, based on Law 4495/2017.
Learn More

3D Studies

Preparation of 3D studies and photorealistic visualizations, for a full understanding of the space before construction or renovation.
Learn More

E/M Studies

Preparation of electromechanical (E/M) studies for heating, air conditioning, water supply and electrical installations, in accordance with the applicable specifications.
Learn More

Renovations

At Dimisign we undertake residential and commercial renovations with comprehensive design, technical supervision and quality implementation.
Learn More